Announcement

Collapse
No announcement yet.

The Elusive Pelican Class

Collapse
X
Collapse
  •  

  • The Elusive Pelican Class










    You might have seen one or two of these home built oversized prams out and about. The Pelican was originally created in
    1959 by Captain Bill Short. His original, simple 12' home built plywood pram could be made from sheets of marine grade plywood and some planks of vertical grain fir or spruce. A design which incorporates the simplicity of the El Toro with the flare of a Banks Dory and an oriental Sampan bow. The stability of the boat, it's roominess, and balanced helm make it an ideal boat for gunkholing and family sailing on a budget.

    Bill Short went on to build a 16' version called the "Great Pelican" which was followed up by the 14'7" Pacific Pelican designed by Bill Barlow, his son Jim and Bill Short.

    Additional Images

    The Pacific Pelican is specifically intended to meet these criteria of safety, comfort, and low cost. She is deeper, has more storage space, and is more stable than a racing dinghy or yacht tender. Although not a racer, the Pacific Pelican is fast in a breeze of 7-9 knots. The design incorporates the lines of a Banks dory with the oriental sampan bow. If her lines were extended to the dory’s extreme ends she’d be about 22’ long. The pram bow is safe, it will not dig in and cause a broach capsize when running before 3Okt gusts in 3’-4’ seas; we know, we’ve done this on blustery San Francisco Bay!
    Jim Barlow






    Plans for the Pacific Pelican can be purchased Here

    In it's heyday, the Pelican fleet attracted as many as 42 boats from the West Coast to participate in the Annual San Francisco Trans-Bay Pelican Race



    Chloe, the original Pelican, passed all her heavy-weather channel tests with flying colors. An article appearing in Rudder, May 1963, thoroughly describes her sailing characteristics. Briefly, her great stability and buoyancy are created by combining the lines of the famous Banks fishing dory with the Oriental sampan. Foredecks, side decks and ample stern deck, make her exceptionally dry. Real coamings around the entire cockpit complete her corkiness. The combination of resilient lug rig and the great flare and freeboard of her beamy topsides make her outstandingly safe.

    Full Article

    Today, the Norcal Pelican Class runs a nomadic list of regattas, with site that include Tomales Bay, Lake Washington (Sacramento), Lake Merritt, Huntington Lake, The Estuary and Richmond. Interested parties can contact the group via Their Group Discussion Panel

    MATERIALS LIST

    MARINE PLYWOOD 4’X8’ SHEETS

    Sheet A: 3/4” ply. - Bow and Stern Transoms, Centerboard, Rudder, Rudder core, Tiller cheeks.

    Sheet B: 1/2” ply. - Centerboard trunk, Thwart, Rudder cheeks, Floor timbers.

    Sheet C: 1/2” ply. - Keelson, Thwart, Footlings, Floor timbers.

    Sheet D: 3/8" pIy. - Aft Side planking

    Sheets E and F: 3/8” ply. - Forward side Planking, side deck, bowsprit.

    Sheet G: 3/8” ply. - Forward bottom planking.

    Sheet H: 3/8” ply. - Foredeck, Cockpit seats.

    Sheet I: 3/8” ply. - After Deck, After Coaming, Butt plates, Cockpit seals.

    Sheet J: 3/8” ply. - Aft bottom planking, Deck knees, scrap for gussets.

    Sheet K: 3/8” ply. - Fore and Side Coaming, Deck knees.

    Sheet L: 1/2” ply. - Deck beams, Headledges, Footlings, Chain plate backing.

    In total, one 3/4” sheet, three 1/2” sheets, and eight 3/8” sheets are required. If the side planking and decks are made from 1/4” plywood, five of the eight 3/8” sheets can be 1/4”. They are sheets D,E,F,H, and I. We recommend staying with 3/8” ply however, for all—around sturdiness. If panel I is 1/4”, the aft coaming will not be sturdy enough as it is laid out. Another partial panel of 3/8” or 1/2” plywood will be required. Also, the material for the aft cockpit seats will be marginal since it comes from panels H and I.

    CLEAR STRAIGHT GRAIN FIR BOARDS

    (All widths and thicknesses are nominal unless identified as true).

    2”X6”
    6' long for the bow transom top and bottom cheek pieces. This should be planed down to a true 1” thickness.
    2”x4”
    two pieces each 8’ long for the remaining transom cheek pieces. Also planed down to a true 1”.
    1”x8”
    two pieces 16’ long. These are for the laminated chine and sheer clamp. The sheer clamp strips should be cut off the boards first and then the boards should be planed down to a true 1/2” for the chine
    laminates.
    five pieces 8' long. For the transom knees, thwart stringers and stiffeners, the bowsprit, frame battens and stempost.
    1”x6”
    three pieces 6’ long. For the bedlogs and the stanchions.
    1”x4”
    three pieces 8’ long. For the side deck strangers, mast and deck carlngs.

    (You may wish to figure out how you will lay out the parts on these boards before you start to cut them. Remember to select the direction of end grain for maximum resistance to splitting).

    MAHOGANY

    A 1/2” by 6” (true) by 14’ long board could be used as the top layer of the keelson. This will dress up the interior of the boat. It will have to be planed to size at the yard. You will also need some mahogany for
    coaming trim.

    SPARS, TILLER

    Specific lumber requirements are not given for these parts because there is some choice in how they are made. The spars could be laminated from some combination of fir or spruce, and mahogany, for example, or you may choose to purchase your spars. The tiller could be likewise laminated of several woods.
      Posting comments is disabled.

    Latest Articles

    Collapse

    • Gitana Relaunched With Shorthanded Emphasis
      by Photoboy



      The Maxi Edmond de Rothschild relaunched


      Wednesday, may 11, 2022 - Early yesterday morning, the large doors to the Gitana shed were opened to release the Maxi Edmond de Rothschild from her five-month refit. Enjoying a ringside seat, her skipper, Charles Caudrelier, looked on attentively, though his mind is already geared towards the open ocean and the Route du Rhum - Destination Guadeloupe, the major meet in the team’s 2022 race schedule. For its 12th
      ...
      05-11-2022, 10:12 AM
    • FlyingNikka Splashes
      by Photoboy
      "FlyingNikkais in the water! Incredible effort by King Marine, project manager Miguel Costa, and all the systems suppliers to get this complex and challenging design first imagined by Roberto Lacorte to the water on a schedule set a year ago. Congratulations and thanks to all."
      Mark Mills






      Designed by a team coordinated by Irish designer Mark Mills of Studio Mills Design, FlyingNikka , 19 meters long and equipped with latest generation...
      05-07-2022, 09:42 AM
    • Elevator And Rudder Rake For Nacra 17
      by Photoboy
      Fresh for Paris 2024, the Nacra 17 fleet will debut two upgrades to the rudder system in Palma 2022. Following the Tokyo Olympics, an updated elevator and an adjustable rudder rake system were approved by class membership for onward use. Heading toward Palma 2022, teams competing will now be using these updated systems. The updated elevator is much the same as before but has been modified to provide a safer profile to the fleet. It is slightly asymmetric, reducing the amount it pro...
      02-28-2022, 07:09 PM
    • Carbon Footprint Analysis Of IMOCA Build Revealed
      by Photoboy
      Lifting the lid on boat build impacts for a more sustainable industry In brief: Results from top US offshore sailing team’s life cycle assessment of construction of new race boat highlights requirement for radical change in class rules for construction of performance yachts. CO2 footprint of building one offshore boat has increased by two-thirds over the past 10 years: 550 tCO2e, equivalent to construction of 105 midsize cars. 11th Hour Racing Team calls for marine industry emissions and m...
      02-17-2022, 11:12 AM
    • Expanding Hydrogen Into Commercial Cargo Shipping
      by Photoboy
      Energy Observer 2: a new zero-emission ship to meet the objectives of the International Maritime Organization Since its creation, Energy Observer pushes the limits of maritime decarbonation. After having developed an autonomous laboratory vessel with the first complete hydrogen chain, capable of producing its own hydrogen with its surplus of renewable energies, Energy Observer is taking a new step by launching the design of the most representative ship of the maritime transport industry: a multi...
      02-07-2022, 03:03 PM
    • Emirates Team New Zealand Hydrogen Foiling Chase Boat In Fitout Preparing For Launch
      by Photoboy
      Auckland, New Zealand - 6th February 2022 Emirates Team New Zealand’s prototype hydrogen foiling chase boat is in the final stages of a complex fit out prior to its launch in March. The construction of the boat was started in August 2021 at the team’s North Shore build facility, the appendage construction is in its final stages and the Hydrogen Fuel Cell Powertrain installation is underway at the team’s base in Auckland’s Viaduct Harbour. The construction of the boat ...
      02-07-2022, 02:54 PM
    Working...
    X